A Global Medical Manufacturer Raises the Bar on Automation
When Gerresheimer set out to expand its Peachtree City, Georgia, facility, with an 18,000 m² (194,000 sqft) extension, the goal wasn’t just more square footage. The medical systems manufacturer, part of a 13,000-employee global group headquartered in Düsseldorf, Germany, was adding a 5,000 m² (53,800 sqft) ISO-8 production extension and a 7,200 m² (77,500 sqft) ISO-9 cleanroom to support a major pharmaceutical client.. From the first sketches, one decision set this project apart: automation wouldn’t be bolted on later. It would be designed in from day one. It also wasn’t Gerresheimer’s first time betting on AGILOX: facing a growing shortage of skilled intralogistics labor, and backed by its own material flow analysis and ROI calculation, the team chose AGILOX again, weighing the vehicles into the building, conveyor, and material flow design from the earliest planning stages.

